This is project house in Arlington VA. We did lot of work on this house.

Probably should start in basement. We installed recess lighting with new switch(running new line). Than finished dropped ceiling and fixed and painted walls.

Bathroom needed just replace sink, fan, light and few details like replacing old outlets etc...


First floor had kitchen where we refinished cabinets so they look like new and replace 2 broken tiles. Also we install crown-molding in living room and dining and kitchen area. Fixed walls, trims, painted, pulled TV wires to correct places, replace outlets lights.


In bathroom we changed sink where we had to re-rout water lines and install new sink, some of the cracked tiles got changed and whole bathroom got re-grouted so you cannot say that it is old tile. look like new tile-work. Light got changed and walls painted.



We had to change whole stairway going upstairs to 2nd floor, with custom made railing. Also we had to install new lights in hallway and rerouted wires from old spot where light originally was. Also in closet we added switch for light. Fixed few other things.





And we got to second floor. Lets start with window in second level. there was 1 2x3' window and we opened wall and put in same but new window with 3x3' windows on each side.



Bathroom needed change first 2 lines of tiles so owner decided to change them for bigger tiles with insert for shampoo and than re-gout also rest of the bathroom. Same as other 2 bathrooms this needed to change sink and light.




We did fence where terrain didn't make it easiest, but looks good


Snow knocked down small roof at front door so we reattached it with adding nice support so it wouldn't happened again.

We also fixed gutter in back of the house and replaced one in front.